DVGW G 469 PDF

Technical Rule – Code of Practice. DVGW G (A) |June Pressure testing methods for gas transmission/gas distribution. DVGW G – DVGW G Polyethylen gas pipelines with an operating pressure up to and including 10 bar (PE 80, PE and PE-Xa) -. Technical rule [WITHDRAWN] Article is not orderable. DVGW G Compression strength test for pipelines and facilities of gas supply.

Author: Yodal Ketilar
Country: Angola
Language: English (Spanish)
Genre: Art
Published (Last): 19 November 2008
Pages: 34
PDF File Size: 11.89 Mb
ePub File Size: 5.9 Mb
ISBN: 208-1-18828-958-5
Downloads: 65218
Price: Free* [*Free Regsitration Required]
Uploader: Mizshura

Hydrostatic testing — CEPS a.s.

Pressure tests must be carried out by qualified personnel with the relevant knowledge of pipeline engineering, the execution of pressure tests, the measurement techniques and the applicable safety regulations. The test sections must be defined so that:.

The water loss method see DVGW Worksheet W can be used as an equivalent alternative to the pressure loss method described above. The pressure loss may amount to: The main test is a test of the entire system, and in particular of the watertightness and proper execution and installation of the pipes, fittings, etc.

  LONPOS 505 PDF

Pressure test ǀ Mannesmann Line Pipe

The test sections must be defined so that: Before starting the test, the pipeline must be slowly and evenly filled with water at a rate of about 0. It is carried out over a period of 3 hours for pipes up to DN The pressure loss may amount to:.

Carry out as specified by the planner Main test: For this reason it is advisable to carry out the pressure test over a period of at least 24 hours. The pressure must be brought back to the test level at regular intervals and in any case after a f of 0.

The pipeline is to be tested over its entire length or, if necessary, in sections. There are two basic test methods: Each pipeline must be subjected to a pressure test after it has been laid.

Before the pressure test can be carried out, the pipeline must be covered with backfill material so as to avoid shifts in position, which could cause leaks. Determines the amount of air still in the pipeline.

  GLYCEMIC DURABILITY OF ROSIGLITAZONE METFORMIN OR GLYBURIDE MONOTHERAPY PDF

Drucken Teilen Xing Twitter. The joints need not be covered by backfill. This applies in particular to pipelines with mechanical socket connections. To stabilize the pipeline section when the soil has finally settled and the cement-mortar lining has absorbed sufficient water.

The pressure test is carried out in a maximum of three steps. The pressure test dgw be carried out in compliance with the requirements laid down in the relevant rules and regulations, e. Water absorption in the cement-mortar pores may initially cause a drop in pressure even if the pipeline is completely watertight.